Organizations and worksites
- TDOT leads the bridge replacement and the planned I-40 interchange rebuild.
- The Town of Arlington completed its Town Hall renovation in early 2026.
- Dement Construction holds the bridge contract.
Crews in Arlington work on a Wolf River bridge replacement, a planned I-40 interchange rebuild at Airline Road and the town's own renovated Town Hall, in a growing town on the eastern edge of Shelby County. We rent remote man camp basecamps, sleeper and bunkbed trailers, showers, restrooms, laundry and kitchens, and plan each camp around your headcount, project length, site access, water, power and wastewater. Call with the site and we will quote it.

Equipment we rent, shown from our team photo library. These photos are not from Arlington.
Public reporting on events and projects. These are not Pioneer jobs, and no organization named here is a customer.
In August 2026, winds above 70 to 80 mph downed trees and power lines across Shelby County and left more than 134,000 customers without power, and TEMA sent a coordinator to support the response. These sources describe the county, not Arlington alone, but Arlington is part of the affected area, and cleanup crews need housing and power close to the work.
TDOT is replacing the Collierville-Arlington Road bridge over the Wolf River in a $16.8 million project. The road closed on September 8, 2026, the bridge should reopen by October 2027, and the whole project should finish in spring 2028. TDOT also plans to rebuild the I-40 interchange at Airline Road, which the mayor said would most likely start in 2027. Public reporting gives no worker counts.
Arlington finished a $2.3 million Town Hall renovation that nearly doubled the building's office space, with a community celebration on February 2, 2026. The project began the summer before. A town renovating its own offices is a sign of the growth that brings road and utility crews to the area.
The I-40 exit at Airline Road (State Route 205) is the main interchange, and Collierville-Arlington Road is closed at the Wolf River with a signed detour until about October 2027. The closure shifts trailer routes, so we confirm the route, the delivery window and the site before we quote, and delivery is quoted per job.
Use $200–$350 per person per day as the turnkey camp planning range. Equipment rates by rental length are on our pricing page. Delivery to Arlington is quoted per job and has no published rate. Rates exclude taxes, permits, utilities, site preparation, setup, servicing, mileage and other project charges unless confirmed in writing.
Arlington is served from our Memphis hub. Call with the site address and we will confirm delivery and rates.
Arlington is served from our Memphis hub. Call with the site address and we will confirm availability, delivery and timing. We do not promise a delivery time until we know the site and the unit.
Use $200–$350 per person per day as the turnkey camp planning range. Delivery is quoted per job. The final camp depends on workforce size, project duration, site access, water supply, power and wastewater service.
It can. Collierville-Arlington Road is closed at the Wolf River with a detour, so we plan the route and the delivery window around it and tell you what to expect before delivery.
Requirements vary by city or county, so confirm what applies with the local authority. We offer emergency CAD and site planning, which is drafting and permit coordination. Engineering, licensed professional review or agency approval may still be required.
We confirm the route, closures and the site before we quote, and tell you what to expect before delivery. We do not promise a delivery time until we know the route and the unit.
Tell us the site address, equipment, rental period and site needs. Call 888 385-5513, answered 24/7.