Organizations and worksites
- The Town of Collierville runs the library expansion and the downtown drainage work.
- Collierville High School sits beside the Shelby Drive widening.
- The Memphis MPO and TDOT partner with the Town on road projects.
Crews in Collierville work on the Shelby Drive and Highway 72 road widening, the Burch Library and Civic Center expansion, and downtown drainage and utility projects, in a town that sits east of Memphis along Poplar Avenue. Winter storms in January 2026 closed town buildings and cut power for thousands of customers. We rent remote man camp basecamps, sleeper and bunkbed trailers, showers, restrooms, laundry and kitchens, and plan each camp around your headcount, project length, site access, water, power and wastewater. Call with the site and we will quote it.

Equipment we rent, shown from our team photo library. These photos are not from Collierville.
Public reporting on events and projects. These are not Pioneer jobs, and no organization named here is a customer.
Snow began on Saturday, January 24, 2026 and turned to widespread ice by Sunday, and the Town closed its facilities that weekend and began reopening them by January 30. The Town told residents to report outages directly to MLGW, and local reports describe residents without power as temperatures fell, including a wind event that cut power to some 6,200 MLGW customers. Cold snaps like this are when a crew on site needs heated sleeping units and backup power.
Town of Collierville weather updatesCollierville residents with no power
The Town extended the closure of Shelby Drive near Collierville High School until August 2026 for a road widening done with the Memphis MPO and TDOT, and estimates the whole project will finish in December 2026, about five months ahead of schedule. Public reporting gives no count of construction workers, so we make no claim about crew size. Road crews working a closure like this often travel in from other areas.
The Town has announced the expansion and renovation of the Burch Library and Civic Center at 501 Poplar View Parkway. The plan adds about 23,000 square feet to a building of about 26,500 square feet, with new HVAC, flooring and furnishings, and completion expected in spring 2028. Downtown drainage phases are also scheduled, with Phase IV expected to start construction in spring 2026.
Poplar Avenue is State Route 57, and TDOT's March 2026 West Tennessee notice lists work on Poplar Avenue from Fletcher Road to I-269. The Town is also building a coordinated signal system on Byhalia Road, and it reports that Collierville-Arlington Road carries between 6,200 and 8,800 vehicles a day. Trailers bound for Collierville use these corridors, so we confirm the route, the delivery window and the site access before we quote, and delivery is quoted per job.
TDOT West Tennessee constructionTown of Collierville project management
Use $200–$350 per person per day as the turnkey camp planning range. Equipment rates by rental length are on our pricing page. Delivery to Collierville is quoted per job and has no published rate. Rates exclude taxes, permits, utilities, site preparation, setup, servicing, mileage and other project charges unless confirmed in writing.
Collierville is served from our Memphis hub. Call with the site address and we will confirm delivery and rates.
Collierville is served from our Memphis hub. Call with the site address and we will confirm availability, delivery and timing. We do not promise a delivery time until we know the site and the unit.
Use $200–$350 per person per day as the turnkey camp planning range. Delivery is quoted per job. The final camp depends on workforce size, project duration, site access, water supply, power and wastewater service.
It depends on the lot, zoning and access. We review access, pad conditions, power, water and wastewater, and the local authority decides what is allowed. Call with the address.
Requirements vary by town or county, so confirm what applies with the local authority. We offer emergency CAD and site planning, which is drafting and permit coordination. Engineering, licensed professional review or agency approval may still be required.
Sleeper units list climate control, and camps can bundle generators for power. Tell us the dates and the site and we will plan heating, water and waste for cold weather.
Tell us the site address, equipment, rental period and site needs. Call 888 385-5513, answered 24/7.