Organizations and worksites
- MAHLE is adding electric compressor production at its Morristown plant, with nearly 800 employees in Hamblen County after the expansion.
- TDOT's SR 34 (US 11E) widening starts at SR 32 (US 25E) in Morristown.
Crews in Morristown work on TDOT's widening of State Route 34 (US 11E) and on expansions at the city's plants, including MAHLE's electric compressor line. We rent remote man camp basecamps, sleeper and bunkbed trailers, showers, restrooms, laundry and kitchens for the crews behind that work, and plan each camp around your headcount, project length, site access, water, power and wastewater. Call with the site and we will quote it.

Equipment we rent, shown from our team photo library. These photos are not from Morristown.
Public reporting on events and projects. These are not Pioneer jobs, and no organization named here is a customer.
On the morning of May 8, 2024, a supercell thunderstorm tracked from the northern Cumberland Plateau through Morristown and east to Greeneville. The National Weather Service says it produced very large hail and damaging wind, with straight-line winds rated at 88 mph snapping trees in the Hamblen Memorial Gardens and winds up to 93 mph in eastern Hamblen County between Morristown and Russellville. A funnel cloud formed, but no tornado reached the ground. Severe storms like this leave crews and residents needing power, repairs and a place to stay.
TDOT is widening State Route 34 (US 11E) from SR 32 (US 25E) in Morristown toward Steadman Road, from a two-lane rural road to a five-lane facility or a realigned two-lane road depending on location. TDOT split the work into three phases. Phase 1, from SR 32 to near East Morris Boulevard, had construction scheduled for April 2025, and TDOT's July 15, 2026 status shows work under way, with Phase 1 estimated to finish on September 4, 2029. TDOT's page reports no worker headcount.
On August 27, 2025, the state announced that MAHLE will invest more than $10 million and add nearly 50 jobs at its Morristown manufacturing operations, bringing its Hamblen County headcount to nearly 800. The expansion starts production of electric compressors. MAHLE's chairman described it as transforming a production plant formerly dedicated to internal combustion engines, so it is an expansion of an existing plant. The release gives no construction timeline.
TDOT says State Route 34 connects SR 32 (US 25E) in Hamblen County with Interstate 81 in Greene County. The existing road between SR 32 and Steadman Road is a two-lane rural arterial, and TDOT's status page describes active grading, paving, utility and traffic-shift work, so expect lane changes and work zones along the corridor. TDOT's page does not describe freight routes, so we confirm the route, the unit and the site before we quote delivery, and delivery is quoted per job.
Use $200–$350 per person per day as the turnkey camp planning range. Equipment rates by rental length are on our pricing page. Delivery to Morristown is quoted per job and has no published rate. Rates exclude taxes, permits, utilities, site preparation, setup, servicing, mileage and other project charges unless confirmed in writing.
We serve these places from our Morristown hub. Places with a page link to it; the rest are planned.
All of Tennessee · Memphis · Nashville · Knoxville · Chattanooga · Murfreesboro · Portland · Oak Ridge · Cookeville · Crossville · Johnson City · Dyersburg · Clarksville · Jackson
Morristown is a hub city on our Tennessee service map. Call with the site address and we will confirm availability, delivery and timing. We do not promise a delivery time until we know the site and the unit.
Use $200–$350 per person per day as the turnkey camp planning range. Delivery is quoted per job. The final camp depends on workforce size, project duration, site access, water supply, power and wastewater service.
It depends on the lot, access and local rules. We review access, pad conditions, power, water and wastewater, and the local authority decides what is allowed. Call with the address.
Requirements vary by county or city, so confirm what applies with the local authority. We offer emergency CAD and site planning, which is drafting and permit coordination. Engineering, licensed professional review or agency approval may still be required.
Rental length depends on your project, and it is part of your quote. Tell us the start date and how long you expect to need housing.
Call and tell us the site, the crew size and what you need. Our phone is answered 24/7. We do not promise a dispatch time until we know your location and equipment.
Tell us the site address, equipment, rental period and site needs. Call 888 385-5513, answered 24/7.