Organizations and worksites
- Ascension Saint Thomas Rutherford is expanding its Westlawn campus with a $10 million cardiovascular build-out.
- TDOT's SR 99 widening is the largest roadwork in the corridor, with the final phase due by December 2027.
Crews in Murfreesboro work on TDOT's widening of New Salem Highway (SR 99) and on hospital expansion at Ascension Saint Thomas Rutherford. We rent remote man camp basecamps, sleeper and bunkbed trailers, showers, restrooms, laundry and kitchens for the crews behind that work, and plan each camp around your headcount, project length, site access, water, power and wastewater. Call with the site and we will quote it.

Equipment we rent, shown from our team photo library. These photos are not from Murfreesboro.
Public reporting on events and projects. These are not Pioneer jobs, and no organization named here is a customer.
A winter storm hit Tennessee from January 22 to 27, 2026, and a federal Major Disaster Declaration followed. Rutherford County was designated for Emergency Protective Measures, which covers costs such as search and rescue, Murfreesboro Fire Rescue and Rutherford County EMS, and warming center and shelter costs. FEMA said more designations may follow if damage assessments show a need for permanent repairs. Storms like this leave crews and residents needing heat, beds and showers fast.
TDOT is widening New Salem Highway (SR 99) from two lanes to five over about seven miles, from Veterans Parkway to SR 96 (Old Fort Parkway), excluding the I-24 interchange area. Phase 2, from I-24 to SR 96, opened in January 2025. Phase 3, from Veterans Parkway to Cason Lane, has been under construction since February 2025, with completion estimated on or before December 2027 and subject to change. TDOT's page reports no worker headcount.
Ascension Saint Thomas Rutherford announced a $10 million expansion of its Westlawn campus on April 2, 2025. It builds out a second floor, adding 12,000 square feet of cardiovascular care, including a 12-room heart clinic with outpatient imaging such as cardiac CT. The release gave an anticipated opening in May 2026, and we have not confirmed that it opened. Hospital build-outs like this keep trades on site for months.
SR 99, New Salem Highway, is the corridor TDOT is rebuilding between Veterans Parkway, the Southwest Loop, and SR 96, Old Fort Parkway. Phase 3 is an active work zone, so lane shifts and closures are possible on deliveries until about December 2027. TDOT's page does not describe freight routes, so we confirm the route, the unit and the site before we quote delivery, and delivery is quoted per job.
Use $200–$350 per person per day as the turnkey camp planning range. Equipment rates by rental length are on our pricing page. Delivery to Murfreesboro is quoted per job and has no published rate. Rates exclude taxes, permits, utilities, site preparation, setup, servicing, mileage and other project charges unless confirmed in writing.
We serve these places from our Murfreesboro hub. Places with a page link to it; the rest are planned.
All of Tennessee · Memphis · Nashville · Knoxville · Chattanooga · Portland · Oak Ridge · Cookeville · Crossville · Morristown · Johnson City · Dyersburg · Clarksville · Jackson
Murfreesboro is a hub city on our Tennessee service map. Call with the site address and we will confirm availability, delivery and timing. We do not promise a delivery time until we know the site and the unit.
Use $200–$350 per person per day as the turnkey camp planning range. Delivery is quoted per job. The final camp depends on workforce size, project duration, site access, water supply, power and wastewater service.
It depends on the lot, access and local rules. We review access, pad conditions, power, water and wastewater, and the local authority decides what is allowed. Call with the address.
Requirements vary by county or city, so confirm what applies with the local authority. We offer emergency CAD and site planning, which is drafting and permit coordination. Engineering, licensed professional review or agency approval may still be required.
Rental length depends on your project, and it is part of your quote. Tell us the start date and how long you expect to need housing.
Call and tell us the site, the crew size and what you need. Our phone is answered 24/7. We do not promise a dispatch time until we know your location and equipment.
Tell us the site address, equipment, rental period and site needs. Call 888 385-5513, answered 24/7.