Organizations and worksites
- The Cheatham County industrial park on Thompson Road is the planned port site.
- Ingram Marine Group is the announced port developer.
- The Town and county are working on park and trail projects.
Crews in Ashland City work on a new Cumberland River port, park drainage and accessibility upgrades, and the state routes that run along the river, in a town that has already lived through the costliest flood in county history. We rent remote man camp basecamps, sleeper and bunkbed trailers, showers, restrooms, laundry and kitchens, and plan each camp around your headcount, project length, site access, water, power and wastewater. Call with the site and we will quote it.

Equipment we rent, shown from our team photo library. These photos are not from Ashland City.
Public reporting on events and projects. These are not Pioneer jobs, and no organization named here is a customer.
The May 1, 2010 flood is recorded by the Cheatham County emergency agency as the costliest disaster in county history, a rain event of more than 16 inches that the county describes as a 500-year flood. A site near a river like this needs power, water and waste plans that do not depend on one connection, and a camp can bundle generators, water bladders and waste pumping.
In May 2025 TDOT, Cheatham County and Ingram Marine Group announced a multimodal inland river port on a 40-acre Cumberland River site at mile marker 162 in the county industrial park. Ingram builds the $30 million port and TDOT pays for a $3 million pier. We did not find a construction timeline, so we describe it as announced, not as a job with a start date.
Construction is under way at J.W. Johns Jr. Park in Ashland City, with sidewalks, drainage and accessibility upgrades reported in June 2026. It is a smaller job than a plant or an interchange, but it shows steady public works in town. We cite it as the closest sourced rebuild, not a major renovation.
State Route 12 follows the Cumberland River into Ashland City and State Route 49 passes through, and the county is served by US 70 and several other state routes plus an existing rail line. TDOT says the port site is on Thompson Road and within about 10 miles of I-40 and I-65, with potential rail access. We confirm the route and the site before we quote, and delivery is quoted per job.
Use $200–$350 per person per day as the turnkey camp planning range. Equipment rates by rental length are on our pricing page. Delivery to Ashland City is quoted per job and has no published rate. Rates exclude taxes, permits, utilities, site preparation, setup, servicing, mileage and other project charges unless confirmed in writing.
Ashland City is served from our Nashville hub. Call with the site address and we will confirm delivery and rates.
Ashland City is served from our Nashville hub. Call with the site address and we will confirm availability, delivery and timing. We do not promise a delivery time until we know the site and the unit.
Use $200–$350 per person per day as the turnkey camp planning range. Delivery is quoted per job. The final camp depends on workforce size, project duration, site access, water supply, power and wastewater service.
It depends on the lot, flood risk and local rules. We review access, pad conditions, power, water and wastewater, and the local authority decides what is allowed. Call with the address.
Requirements vary by city or county, so confirm what applies with the local authority. We offer emergency CAD and site planning, which is drafting and permit coordination. Engineering, licensed professional review or agency approval may still be required.
We confirm the route, closures and the site before we quote, and tell you what to expect before delivery. We do not promise a delivery time until we know the route and the unit.
Tell us the site address, equipment, rental period and site needs. Call 888 385-5513, answered 24/7.