Organizations and worksites
- Y-12 finished its West End Protected Area Reduction project in 2026.
- ORNL started building its ATOLL laboratory in June 2026.
- A uranium enrichment plant is planned for the former K-25 site.
Crews in Oak Ridge work on Y-12 and ORNL projects, the former K-25 site and a planned uranium enrichment plant. We rent remote man camp basecamps, sleeper and bunkbed trailers, showers, restrooms, laundry and kitchens for the crews behind that work, and plan each camp around your headcount, project length, site access, water, power and wastewater. Call with the site and we will quote it.

Equipment we rent, shown from our team photo library. These photos are not from Oak Ridge.
Public reporting on events and projects. These are not Pioneer jobs, and no organization named here is a customer.
Severe storms, tornadoes, straight-line winds and flooding struck Tennessee from June 5 to 10, 2014. In August 2014 FEMA announced a federal disaster declaration that named 18 counties, including Anderson and Roane, the two counties Oak Ridge sits in. The declaration provided Public Assistance for debris removal, emergency protective measures and repair of public facilities. The coverage was county-level and did not say what Oak Ridge work qualified.
On January 16, 2026, Governor Bill Lee announced a uranium enrichment facility for the historic K-25 site in Oak Ridge, reported as a $1 billion investment with more than 200 jobs. No completion timeline was given in the report. NNSA also broke ground on June 3, 2026 on a 21,000 square foot laboratory at ORNL, the Advanced Testbed and Operations Learning Laboratory, scheduled to finish in mid-2028. No construction headcount was reported for either.
NNSA reported on June 26, 2026 that the West End Protected Area Reduction project at Y-12 is complete. It built a new entry control facility, installed six new sectors of perimeter intrusion detection, revitalized three existing sectors and updated security and operational infrastructure at several mission support facilities. The high-security area shrinks by about 70 acres. Projects like this keep trades on site while existing buildings stay in use.
In October 2010 TDOT formally opened a four-mile widened stretch of State Route 95, the Oak Ridge Turnpike, from Illinois Avenue (SR 62) in Anderson County to Westover Drive in Roane County, and said SR 95 with SR 58 would offer four lanes of direct access to I-40. In 2016, Y-12 moved 110-ton condensers by specialized trailer from the East Tennessee Technology Park north on Highway 58, onto Highway 95 and south to Bethel Valley Road, with police escorts and permits coordinated with TDOT. We confirm the route, the unit and the site before we quote delivery, and delivery is quoted per job.
Use $200–$350 per person per day as the turnkey camp planning range. Equipment rates by rental length are on our pricing page. Delivery to Oak Ridge is quoted per job and has no published rate. Rates exclude taxes, permits, utilities, site preparation, setup, servicing, mileage and other project charges unless confirmed in writing.
We serve these places from our Oak Ridge hub. Places with a page link to it; the rest are planned.
All of Tennessee · Memphis · Nashville · Knoxville · Chattanooga · Murfreesboro · Portland · Cookeville · Crossville · Morristown · Johnson City · Dyersburg · Clarksville · Jackson
Oak Ridge is a hub city on our Tennessee service map. Call with the site address and we will confirm availability, delivery and timing. We do not promise a delivery time until we know the site and the unit.
Use $200–$350 per person per day as the turnkey camp planning range. Delivery is quoted per job. The final camp depends on workforce size, project duration, site access, water supply, power and wastewater service.
It depends on the lot, access and local rules. We review access, pad conditions, power, water and wastewater, and the local authority decides what is allowed. Call with the address.
Requirements vary by county or city, so confirm what applies with the local authority. We offer emergency CAD and site planning, which is drafting and permit coordination. Engineering, licensed professional review or agency approval may still be required.
Rental length depends on your project, and it is part of your quote. Tell us the start date and how long you expect to need housing.
Call and tell us the site, the crew size and what you need. Our phone is answered 24/7. We do not promise a dispatch time until we know your location and equipment.
Tell us the site address, equipment, rental period and site needs. Call 888 385-5513, answered 24/7.